How to Replace Roof Shingles

by | Aug 4, 2025 | Blog

🏠 How to Replace Roof Shingles: Tools, Crew Size & Project Timeline

Replacing roof shingles is a substantial undertaking—whether you’re doing a small DIY repair or a full roof replacement. Understanding the tools needed, manpower involved, and average timeframes helps you plan efficiently and ensure quality results.


🔧 Tools & Materials You’ll Need

Here’s a detailed list of tools and materials essential to safely and effectively replace roof shingles:

Basic Tools

  • Ladder: A stable extension ladder that reaches beyond the roofline.
  • Pry bar / Flat bar: Used to lift old shingles and remove nails.
  • Hammer or Roofing Nailer: For securing shingles.
  • Roofing Nails: Preferably galvanized, sized according to shingle specs.
  • Utility Knife: To trim shingles for a precise fit.
  • Chalk Line: Ensures straight shingle alignment.
  • Tape Measure & Pencil: For accurate cutting and spacing.
  • Tarps or Drop Cloths: To protect landscaping and collect debris.
  • Safety Gear: Gloves, safety glasses, and a fall arrest harness where required—roofing is a leading cause of falls in construction.(rivercityroofs.com, Roofer Digest, iroofreports.com, Wikipedia)

Roofing Materials

  • New Shingles: Match existing style and color if possible.
  • Underlayment: Felt or synthetic roofing felt to act as a moisture barrier.
  • Drip Edge: Panels at roof’s edge to direct water into gutters.
  • Roofing Cement or Sealant: For waterproofing nail heads and edges.
  • Flashing: Around chimneys, vents, and valleys as needed.

Knowledgeable roofers follow a structured order when sourcing materials, ensuring everything is organized before work begins.(Roofer Digest, iroofreports.com)


đŸ‘· Manpower: Crew Size & Roles

DIY or Solo Homeowner

If you’re experienced and the repair is limited to a few shingles, a single person can complete the task. But be cautious—roofing is hazardous and physically demanding.(The Sun) Expect broken nails or stretched seams if done improperly.

Professional Crew

  • Small Crew (2–3 roofers): Typical for smaller or mid-size residential roofs.
  • Larger Crew (4–6 roofers): Ideal for homes up to ~2,500 sq ft with simple roofs.
  • Even Larger Teams: Used by roofing contractors for faster completion on bigger or complex homes.(dbmroofing.com, roofingbylandmark.com)

Crew members typically take on roles like tear-off, underlayment installation, shingle laying, and cleanup—working efficiently like a well-oiled machine.


⌛ Average Time to Replace Roof Shingles

Under standard conditions—moderate weather, a straightforward roof layout, and no structural repairs—a typical asphalt shingle roof replacement timeline is:

  • Small homes (<1,500 sq ft): 1 day
  • Mid-size homes (1,500–2,500 sq ft): 1–2 days
  • Larger homes or more complex roofs: Up to 3 days
  • Premium materials (metal, tile, wood shake): 3–7+ days, potentially up to 2 weeks.(goliniroofing.com, Roof House Pedia, helpwithdiy.com)

A seasoned crew can install around 2–3 squares (200–300 sq ft) per hour under ideal conditions.(a1roofproct.com)


🔍 Step-by-Step Roof Shingle Replacement Process

1. Site Preparation

  • Inspect the roof deck and existing shingles for damage.
  • Run drop cloths or tarps to catch debris.
  • Secure perimeter: remove fragile plants and park vehicles away from debris zone.

2. Tear-Off

  • Carefully remove damaged shingles and old underlayment.
  • Use a pry bar and hammer or shingle stripper for full replacement scenarios.
  • Dispose of debris responsibly—often via a rented dumpster.

Tear-off usually represents around 20% of the total project time.(Roof House Pedia)

3. Install Underlayment & Drip Edge

  • Roll out and secure underlayment from eaves to ridge.
  • Install drip edge along roof perimeters for proper water runoff.

4. Shingle Placement & Roofing

  • Snap chalk lines to guide shingle alignment.
  • Start at the eave, aligning starter strip shingles first.
  • Install shingles from bottom to top, staggering seams per manufacturer specifications.
  • Nail each shingle correctly—usually four nails per shingle in standard installations or six in windy areas.

5. Flashing and Ridge Work

  • Replace flashing around chimneys, vents, and valleys.
  • Install ridge vents or caps to finish the roof properly.

6. Sealing and Inspection

  • Apply roofing cement at nail heads or gaps near roof penetrations.
  • Conduct a thorough final inspection (often with the homeowner) for alignment, sealing, and cleanliness.

Contractor cleanup typically includes magnetic broom sweep, onsite vacuuming, and hauling away all scrap.(Roofer Digest)


⏱ Planning & Timeline Overview

Home Size & ComplexityCrew SizeEstimated Time (Days)
≀ 1,500 sq ft, simple gable roof2–3 crew~1
1,500–2,500 sq ft, standard roof3–4 crew1–2
Larger or steeper roof, multi-level4–6 crew2–3
Complex design, premium materials4–6 crew3–7+

This timeframe may lengthen due to weather interruptions, unexpected decking repairs, or permit delays.(Roof House Pedia, helpwithdiy.com)


⚠ Safety Considerations

  • Roofing work involves elevated heights—rats of falls are high. Ensure contractors comply with OSHA and use fall protection gear.(Wikipedia)
  • Use harnesses, guardrails, or safety nets on slopes above 6 ft. Ladder safety is also critical.
  • Avoid DIY roofing in icy, windy, or rainy conditions.(Wikipedia)

đŸ’Ș DIY vs Hiring Pros

DIY Approach

  • Suitable only for minor repairs or small sections.
  • You must invest in tools, safety gear, and learn proper technique.
  • Risky, time-consuming, and potentially invalidates manufacturer warranties.(iroofreports.com, The Sun)

Hiring Professionals

  • Experienced crews work quickly—often finishing major replacements in 1–2 days.(bondocroofing.com, a1roofproct.com)
  • Certified contractors ensure proper installation, offer warranty-covered labor, and handle permits.
  • Faster, safer, and usually more cost-effective than DIY.

✅ Prepping for Your Roofing Project

  • Choose a certified roofing contractor with licensing, insurance, and positive reviews.
  • Request a written contract outlining materials, timelines, payment, and warranty.
  • Plan for disposal: confirm who handles dumpster rental or waste removal.
  • Check weather forecast before confirming your start date—rain or high winds can delay the job.

🔚 Conclusion

Replacing roof shingles is a serious, labor-intensive task—but when done right, it pays dividends in home protection and value. Whether you’re tackling a small DIY repair or hiring professionals for a full roof replacement, here’s what you now know:

  • The tools you need—from ladders and pry bars to roofing nails and safety gear.
  • Typical crew sizes and how they affect job duration.
  • Realistic time estimates—from 1 day for simple homes to a week or more for complex roofs.
  • The step-by-step process: tear-off, underlayment, shingle installation, flashing, cleanup.