When Remodeling, What Should Be Done First—Windows, Roof, or Siding?
Deep Dive Into the Big Question
When embarking on a major home exterior renovation, one of the most important—but often overlooked—questions is:
🏠 “When remodeling, what should be done first: windows, roof, or siding?”
The answer affects not just project sequencing, but also protection from weather damage, budget control, long-term durability, warranty validity, and even your home’s curb appeal. In this ultimate guide, we’ll cover:
- The importance of job sequencing
- Why roofing typically comes first
- When siding takes priority
- Optimal timing for window replacement
- Weather and regional insights for Northeast Ohio
- Real-world case studies
- Cost breakdowns and financing options
- Contractor selection and permitting advice
- Frequently asked questions
- Final step-by-step remodeling timeline
Whether you’re renovating in Jefferson, Youngstown, Conneaut, or Geneva, let this guide help you get your remodeling sequence—and results—right.
🔁 Why Sequencing Matters in Exterior Remodeling
Ordering roof, window, and siding replacements correctly is crucial. Otherwise, you risk:
- Leaks and water damage during partial projects
- Damaged or misaligned products installed out of sequence
- Voided warranties due to improper flashing or integration
- Re-work and increased costs from overlap mistakes
- Extended project time with crews interfering with each other
A well-planned sequence ensures efficiency, less disruption, and a durable, beautiful final result.
1. Roofing: Why It Often Goes First
Let’s start with the most common first step: roof replacement.
🛡️ Roof Protects the Whole Home
A sound roof is your home’s number one defense against rain, snow, ice, wind—and in Northeast Ohio, that’s no joke. Installing your roof first:
- Shields attic, walls, windows, and siding from inclement weather
- Helps prevent damage to all installed windows and siding later
🔧 Roof Flashing Interactions
Roofing includes installing flashing around vents, dormers, wall junctions, and chimneys—elements that directly affect window and siding installations. Proper flashing ensures integrated waterproofing.
❄️ Seasonal Considerations
Roofing in winter risks ice dams and difficult installation, but can still proceed if weather allows. Once the roof is done, you create a weather-tight shell for the rest of the work.
When Roof Goes First
- You’re dealing with active leaks, missing shingles, or roof age over 20 years
- You’re working with storm damage and insurance claims
- Ice-dam risk is high in cold months
- Your window and siding are in acceptable shape, and weather protection is priority
2. Siding: Why It Often Comes Second
Once the roof is protected, siding replacement is usually the next logical step.
🎨 Aesthetic & Energy Benefits
Replacing siding enhances insulation, stops infiltration, and dramatically improves curb appeal.
🧩 Integration with Windows
Siding must be properly flashed around window openings. It also serves as a moisture barrier, sometimes made optional by upgraded windows with built-in flashing—but most reputable siding jobs rely on flexible housewrap and precise capping.
📏 Measuring & Trim Work
Installing siding afterReplacing the roof ensures accurate measurements for siding, soffit, fascia trim—all dysfunctional details corrected after the new roof.
When Siding Goes Second
- The roof is now secure and weather-tight
- You’re ready to reposition windows or add insulation at sheathing level
- Restoring curb appeal is a priority
- You want flashing installed correctly and clean siding trim lines
3. Windows: Why They Often Come Last
Finally, window replacement is typically scheduled after roofing and siding.
🔄 Correct Flashing Conditions
Windows need a fully shingled roof above and siding around them to ensure step flashing lines up properly.
🪟 Clean Finishing
Installing windows last gives clean, well-fitted trim and caulking, especially with recessed siding profiles.
🔒 Weather-Proofing
Delivering and installing windows after siding ensures wall sheathing is already weather-sealed, reducing risk of interior leaks.
📅 Strategic Timing
- Ideal window replacement time is after siding is installed
- Late spring to early fall offers best installation conditions
- Aligns with manufacturer technical requirements for humidity and temperature
4. Alternative Sequences & Their Use Cases
While the roof → siding → windows order is standard, there are exceptions:
A. Windows Before Siding
- When you’re installing high-end windows first due to interior renovation
- If siding brand includes window-compatible flashings (like James Hardie Weather Barrier)
- Coordination between window and siding crews ensures proper head flashing
B. Roofing and Windows Together
- For large homes with multiple dormers and complex rooflines
- When roof-mounted skylights or roof-windows are installed
- Work takes priority over siding, but windows are installed before siding is completed
C. Siding and Windows Together
- When using integrated panels (like cedar shake) that encase the window
- When all exterior layers are removed and rebuilt from scratch (tear-off remodels)
These exceptions require expert coordination; without it, you risk water damage, warranty issues, and increased labor.
5. Northeast Ohio Weather & Seasonal Insights
Your local climate—particularly Jefferson, Youngstown, Ashtabula—matters hugely:
- Roofing: Best April–November; freezing may slow installation but possible with proper techniques
- Vinyl Siding: Needs 40°F+; full dry window and siding integration
- Windows: Must avoid freezing temps during install and caulk curing
- Rain & Snow Considerations: Plan roofing ahead of substantial precipitation, followed immediately by siding for sealed protection
Client Tip: Building can escalate quickly if roof is delayed ahead of a rainstorm. Plan wisely.
6. Real-World Case Studies from Northeast Ohio
Case Study A: Jefferson Colonial Exterior Refresh
- Roof swapped in early spring
- Premium vinyl siding and new insulated windows installed in late spring
- Result: 30% lower energy bills, modern curb appeal, and one-stop warranties
Case Study B: Youngstown Upstairs Remodel
- Siding partially replaced to expose framing for new skylights and dormer
- Roofing and window replacements scheduled together—head flashing perfectly integrated
- Outcome: Zero temp fluctuations and leak-free finish
Case Study C: GenevA Ranch with Storm Damage
- Storm damaged windows and roof; siding intact
- Roof replaced first via insurance claim
- New windows installed and clad afterward
- Owner chose to delay siding until following spring to maintain waterproof protection
7. Cost Breakdown by Sequence
Average Costs – Northeast Ohio (2025)
Service | Low-End | Mid-Range | High-End |
---|---|---|---|
Roof (2,000 sq ft) | $7,000 | $12,000 | $20,000+ |
Siding (vinyl) | $10,000 | $15,000 | $25,000+ |
Windows (15 units) | $6,000 | $10,500 | $18,000+ |
Total Project Cost
Standard sequence: $27,000–$45,000
Window-first complex: Potential reinstallation cost from flashing errors adds $1,500–$3,000
Bundled contract: May reduce combined cost 5–15% with labor efficiencies
Financing tip: Bundling all three projects can qualify for energy-efficiency rebates and 0% contractor financing plans—available through companies like S&K Construction.
8. Financing, Rebates, & Insurance
1. Rebates & Tax Credits
- Energy Star window rebate: up to $200–$600
- State incentives for high-efficiency remodeling
2. Contractor Financing
- 0% interest for 6–18 months on bundled projects
- Low monthly payment plans ($199–$349/mo) with credit approval
3. Insurance Coverage
- For storm damage, replace roof and windows under claim
- Siding may not be covered—bundle afterwards to minimize labor cost
9. Choosing the Right Contractor
Coordinate all three parts with one trusted team to avoid miscommunication and extra costs.
✅ Ask for proof of:
- Ohio license & insurance
- Manufacturer certifications (Owens Corning, James Hardie, Marvin Windows)
- Project portfolio showing full exterior remodels
- References from Northeast Ohio clients
✅ Confirm they:
- Provide bundled quotes with clear line items per scope
- Handle all permitting
- Manage sequencing and installation schedules
- Provide single warranties and warranty coordination
S&K Construction and Remodeling LLC is a prime example—fully certified in roofing (Owens Corning Preferred), siding (James Hardie installer), and window installation—making them a one-stop seamless solution.
10. Permits and Inspections
Permitting for roofing, siding, and windows varies by municipality:
- Roof: Usually requires a $150–$350 permit
- Siding: $200–$500, may include energy rating documentation
- Windows: $100–$300, depending on energy performance reporting
Choose a contractor that handles all permits—it keeps costs down and avoids job interruptions.
11. Step-by-Step Exterior Remodel Timeline
Week 0 – Design & quote phase (2–4 quotes, version comparisons)
Week 1 – Sign contract, secure materials, pull permits
Week 2–3 – Roof replacement (tear-off, underlayment, flashing, shingles)
Week 4–5 – Siding removal, house wrap, siding install, soffit/fascia/gutter fit
Week 6 – Window installation, interior trim, exterior caulking
Week 7 – Final inspection, warranty docs, cleanup, walkthrough
This 7‑week timeframe minimizes exposure and maximizes quality coordination.
12. FAQ – Your Top Questions Answered
Q: What if my roof is fine but siding and windows are worn?
A: You can start with siding and windows—provided roofing is under 10 years old and flashings are intact.
Q: Will installers tarp over unfinished siding areas?
A: Reputable crews use tarps and plywood to shield against rain during transitions.
Q: Can I install siding before the roof?
A: Only if the roof is new or sound, and you understand the flashing integration risk.
Q: Do bundled warranties save money?
A: Yes—bundle pricing can include labor coverage across all systems for 5–10 years.
Q: Should I segment all into separate contracts?
A: It’s possible, but disjointed crews may miss overlaps—bundling ensures accountability.
13. Final Thoughts: Your Winning Strategy
For nearly all major exterior remodels, the optimal formula is:
- Roof first – to protect your investment and entire home
- Siding second – for insulation, aesthetics, and structural envelope
- Windows last – for clean finishing and seal integrity
This sequence ensures:
- Maximum weather protection
- Accurate flashing and trim work
- Single cleanup phase
- One cohesive team for warranty and support
If you want all three done right—on time, on budget, and with minimal hassle—consider working with a fully trained, certified contractor like S&K Construction and Remodeling LLC in Jefferson, Youngstown, Ashtabula, and across Northeast Ohio.
👉 Ready to Get Started?
📍 Serving: Jefferson • Youngstown • Ashtabula • Mentor • Painesville • Geneva • Conneaut • and beyond
🏗️ Fully licensed, insured, and manufacturer‑certified
⭐ Hundreds of 5-star reviews
💰 Financing with 0% options, energy rebates, insurance coordination
Call S&K Construction today or click to schedule your free in-home consultation. We’ll help you choose the right sequence of exterior projects and bring your remodel to life—from the shingle up to the final window caulk.